On This Page
What Is Landed Cost?#
Landed cost is the total cost of getting a product from the factory to your door, ready to sell. It is the supplier's price plus everything you pay along the way: freight, insurance, duties and tariffs, customs fees, the customs broker, and delivery from the port.
It matters because the factory price is often only half the story. A product quoted at $4.20 can easily cost $7 or more once it lands, and every pricing decision you make should start from that second number, not the first.
The Landed Cost Formula#
Landed cost = Product cost + Freight + Insurance + Duties and tariffs + Customs fees + Delivery and other costs
Landed cost per unit = Total landed cost ÷ Number of sellable unitsDivide by the units you can actually sell, after any damaged or rejected ones.
What Goes Into Landed Cost#
| Cost | What It Is | How It Is Charged |
|---|---|---|
| Product cost | The price paid to the supplier | Per unit, from your purchase order |
| Freight | Ocean or air transport to the US port | Per shipment, from your forwarder's quote |
| Insurance | Cover against loss or damage in transit | A small percentage of the cargo's value |
| Duty | The normal rate for the product's tariff code | Percentage of the goods' value |
| Extra tariffs | Section 301, Section 232 and similar tariffs | Percentage of the goods' value, depending on product and country |
| Merchandise processing fee | A US customs fee on every entry | 0.3464% of value, minimum $34.58 and maximum $670.86 per formal entry (from October 1, 2026) |
| Harbor maintenance fee | A fee on cargo arriving by ship | 0.125% of value, ocean only |
| Customs broker and bond | Filing the entry and guaranteeing payment | Per entry, or yearly for a continuous bond |
| Delivery and other | Trucking from the port, inspection, labeling, storage | Per shipment |
A Worked Example#
The calculator opens with this example. You buy 1,000 units at $4.20 ($4,200 of goods) and ship them by ocean:
- Freight $2,400, and insurance at 0.5 percent of goods plus freight: $33.
- Duty at 3.4 percent of $4,200: $142.80. No extra tariffs in this example.
- The goods are worth more than $2,500, so this is a formal entry. The processing fee would be 0.3464 percent of $4,200, which is $14.55, so the $34.58 minimum applies.
- Harbor maintenance fee at 0.125 percent: $5.25.
- Broker $175, bond $75, delivery from the port $650, other costs $300.
The total comes to $8,015.63, or about $8.02 per unit: 91 percent more than the factory price. Now change the extra tariffs box to 37.5, as for many goods from China, and watch the total climb by $1,575, to about $9.59 a unit.
Landed Cost vs FOB, EXW and CIF#
Supplier quotes use trade terms that decide which costs are already included:
- EXW (ex works): the price at the factory door. You pay for everything from there, including local trucking and export clearance.
- FOB (free on board): the price with the goods loaded on the ship at the export port. You pay the ocean freight onward. This is the most common quote for ocean shipments.
- CIF (cost, insurance and freight): the supplier pays freight and insurance to the US port; you pay from arrival.
Whatever the term, landed cost is the complete number once the goods reach you. One useful detail: US duty is generally charged on the price of the goods, not on the international freight and insurance when those are listed separately. Many countries charge duty on the CIF value instead, so be careful when comparing quotes or reading foreign guides.
How to Use Landed Cost to Set Your Price#
Once you know the landed cost per unit, work forward to a wholesale price that leaves room for you, your distributor and the store. If a store expects to double its cost, and your landed cost is $8.02, a $14 wholesale price leaves you $5.98 a unit before your own overheads, and puts the shelf price around $28. Enter a selling price in the calculator to see your margin instantly, and read how wholesale and retail margins work for the full method.
Common Mistakes#
- Pricing from the factory quote. The landed cost is the real cost.
- Forgetting extra tariffs. For goods from China they can add more than a third to the value. See import duty from China.
- Assuming small parcels are duty-free. The $800 duty-free rule no longer applies.
- Leaving out the small fees. Broker, bond, fees and port charges add up on every shipment.
- Dividing by units ordered instead of units sellable. Damaged and rejected items still cost money.
- Not updating it. Freight rates and tariffs change. Recalculate before each order.